Black Friday Special

1 of 5
#Bodenaufbaumussweg# #Betonamit# #Österreich #betonmussweg #felsmussweg #estrichmussweg

1. Drill holes

First, drill holes with a diameter of 30-45 mm. The optimal spacing between the holes is 10 times the hole diameter, i.e., approximately 30-40 cm. The drill holes should be as clean and dry as possible.

#Bodenaufbaumussweg# #Betonamit# #Österreich #betonmussweg #felsmussweg #estrichmussweg

Mixing Betonamit

Add 1.2 liters of cold, clean water for every 5 kilograms of powder.

Mix the components with an electric mixer for approximately 2 minutes until a homogeneous and free-flowing mixture is obtained. If necessary, the consistency can be adjusted by adding a small amount of water. However, the mixture should not be too watery.

#Bodenaufbaumussweg# #Betonamit# #Österreich #betonmussweg #felsmussweg #estrichmussweg

Fill drill holes

Pour the mixture directly from the mixing container into the drilled holes. The total processing time should not exceed 5 minutes. No additional mechanical sealing is required.

For special applications of BETONAMIT® with borehole diameters exceeding 45 mm, it is mandatory to consult with the manufacturer beforehand.

Application video

Anwendungsbeispiele und viele Fragen und Antworten finden Sie in unserem Blog!